Swppp Drafter
v0.1.0Use when a civil engineer, Qualified SWPPP Developer (QSD), Qualified SWPPP Practitioner (QSP), erosion-control designer, environmental consultant, or construction-operator representative needs to convert a single construction project's location, disturbed acreage, soils, slopes, receiving waters, sequence of construction, and planned BMP set into a DRAFT Stormwater Pollution Prevention Plan (SWPPP) aligned to the EPA 2022 Construction General Permit (CGP) — or to the equivalent state CGP when the user names it — before NOI submittal. Guides scoped intake of the permit framework, project, operator(s), site assessment (soils / HSG, slopes, sensitive features, receiving waters and 303(d) / TMDL status), sequence-of-construction with phasing and final-stabilization dates, planned BMPs, and non-sediment pollutant sources (concrete washout, fuel / oil, sanitary, paint / stucco, fertilizer / pesticide, debris, dewatering), builds an Erosion / Sediment / Pollution-Prevention / Post-Construction BMP selection matrix tied to site conditions, sets the inspection-and-corrective-action schedule and signatory block per 40 CFR 122.22, flags numeric-effluent-limit (NEL), dewatering-discharge, and impaired-waters / TMDL requirements, and produces a DRAFT SWPPP with a recordkeeping framework and an unresolved-information list — for QSD / QSP / licensed PE review and sign-off. Never submits an NOI, never signs or seals the SWPPP, never replaces site-specific drawings or calculations or the registered design professional's seal, never opines on permit issuance, never substitutes for the operator's permit responsibility, never overrides the AHJ or state permitting agency.